Fire Stopping in Fire Safety Schedules

Working with Fire Safety Schedules? Make sure the Fire Safety Schedule for your project doesn't contain the below wording for Fire Stopping of service penetrations:


๐™๐™ž๐™ง๐™š ๐™Ž๐™ฉ๐™ค๐™ฅ๐™ฅ๐™ž๐™ฃ๐™œ ๐™ค๐™› ๐™จ๐™š๐™ง๐™ซ๐™ž๐™˜๐™š ๐™ฅ๐™š๐™ฃ๐™š๐™ฉ๐™ง๐™–๐™ฉ๐™ž๐™ค๐™ฃ๐™จ... ๐™ข๐™ช๐™จ๐™ฉ ๐™—๐™š ๐™ž๐™ฃ ๐™–๐™˜๐™˜๐™ค๐™ง๐™™๐™–๐™ฃ๐™˜๐™š ๐™ฌ๐™ž๐™ฉ๐™ ๐™ฉ๐™๐™š ๐™ฉ๐™š๐™จ๐™ฉ๐™š๐™™ ๐™ฅ๐™ง๐™ค๐™ฉ๐™ค๐™ฉ๐™ฎ๐™ฅ๐™š


As awareness of Passive Fire Protection increases in the industry, terms such as 'tested prototype' and 'tested system' are becoming more prevalent. An example of this use can be seen in Fire Safety Schedules, which are included as part of building approvals and list both the active and passive fire safety systems required in the building along with the applicable standard(s) of performance for the measure.


Whilst on face value, requiring Fire Stopping of service penetrations to be in accordance with a tested prototype may seem harmless, the reality is that this can significantly reduce available fire stopping systems, noting that:


โถ A large portion of compliant fire stopping systems for service penetrations on the market vary from the tested prototype as it is not practical nor is it necessary to include all possible variations to a service / system (e.g. changes to pipe materials and/or sizes, wall construction, or cable types/configurations etc.) in a single fire test; and


โท Variations to tested prototypes are permitted under the National Construction Code, provided the variations are assessed and documented in a Report prepared by an Accredited Test Lab (such as Resolute Testing Laboratories, CSIRO and Warringtonfire) which details the construction and requirements of the varied system along with the FRL it has been assessed to achieve in accordance with Section 4 of AS 4072.1-2005.


Noting the above, we recommend reviewing Fire Safety Schedules as early as possible on projects to ensure this wording isn't included and unnecessary defects are avoided.


Looking for smarter ways to ensure your project is #NCC compliant? Follow Code Consultancy Group or get in contact:


๐—ฃ๐—ต๐—ผ๐—ป๐—ฒ: 02 9651 2864

๐—˜๐—บ๐—ฎ๐—ถ๐—น: team@codecg.com.au

๐—ช๐—ฒ๐—ฏ: www.codecg.com.au




Recent Posts

See All

Comentarios


bottom of page